Complete System

Núll-kelvins viðmiðunarkerfi

Zero-Point var enn yfir núlli.

$389,000
Núll-kelvins viðmiðunarkerfi

Helstu eiginleikar

  • Fullt ofurleiðandi merkjakeðja — afl, klukkur, stafrænt, hliðrænt, hátalari
  • Miðlægt 12-tengi LN2 dreifihluti — einn tank fæðir allar snúrur
  • Heildarkerfiviðnám: 0,000000 ohm — mælt við 77K
  • Heildar segulhlutleysisbeyging: 0,000000 gráður
  • Heildar rafsegultenging: 0,000000 hlutfallseiningar
  • Faraday-búr um LN2-dreifiskipta — 80dB seguldeyfing
  • Eins árs frestað áskrift að AI-beygingarstýringarþjónustunni meðfylgjandi

Tæknilýsingar

Medfylgjandi kaplar 4× SC Power (2m), 1× SC Digital (1.5m), 1× SC Clock (1.5m), 2× SC Interconnect (1.5m), 1× SC Speaker Pair (3m)
LN2-geymir 500L vacuum-insulated, stainless steel
Dreifistofn 12-port, individually valved, cryo-rated
Eftirlitsupprodun 24 sensors (temperature, pressure, O2, flow rate)
Stjornkerfi Touchscreen HMI with remote monitoring via Ethernet
Total DC Resistance 0.000000 Ω (entire signal chain)
Segulhlifbun Meissner effect across all cable runs simultaneously
First-Year LN2 Included (~5,840 liters)
Annual LN2 (subsequent) ~$5,840/year (consumption varies with ambient temperature)
Uppsetning 3-day on-site by certified cryo-technician
Heildarkerfisthungi > 1,000 kg (filled)
Aflkrafa Dedicated 30A circuit for monitoring and reservoir heater
Herbergiskrofur Ventilation ≥ 10 ACH, O2 monitoring, emergency shut-off
Golfkrafa Structural assessment mandatory (>1 tonne point load)
Abyrgd 5 years (cables), 3 years (reservoir and manifold), 2 years (monitoring)

Fullkomin ofurleiðandamerkjabraut. Núll viðnám frá vegg til hátalarans. 500 lítra LN2-tankur. ~5.840 lítrar á ári. Yfir eitt tonn. Gólfmat skylda.

Smáa letrið

  • * Requires dedicated 30A electrical circuit. Room ventilation rate ≥ 10 air changes per hour mandatory. Structural engineering assessment of floor mandatory prior to installation. Local building permits may be required. First-year LN2 consumption estimate based on 22°C ambient; actual consumption varies. Subsequent years' LN2 not included. Installation date subject to cryo-technician availability. Results in non-equatorial environments may vary.