Complete System
ज़ीरो केल्विन रेफरेंस सिस्टम
ज़ीरो-पॉइंट अभी भी शून्य से ऊपर था।
$389,000
प्रमुख विशेषताएँ
- Complete superconducting signal chain: power, clock, digital, analog, and speaker
- Zero total DC resistance from wall outlet to speaker driver
- Meissner effect across every cable run — entire system is magnetically null
- 500L central LN2 reservoir with 12-port distribution manifold
- 24-sensor monitoring array: temperature, pressure, O2 depletion, flow rate
- Touchscreen HMI with Ethernet remote monitoring and alarm notification
- First year of liquid nitrogen included (~5,840 liters)
- 3-day professional installation by certified cryo-technician
- Structural floor assessment and reinforcement consultation
- Emergency oxygen depletion alarm system with automatic ventilation trigger
- Annual maintenance program available (reservoir inspection, valve service, sensor calibration)
विनिर्देश
शामिल केबल 4× SC Power (2m), 1× SC Digital (1.5m), 1× SC Clock (1.5m), 2× SC Interconnect (1.5m), 1× SC Speaker Pair (3m)
LN2 भंडार 500L vacuum-insulated, stainless steel
वितरण मैनिफ़ोल्ड 12-port, individually valved, cryo-rated
निगरानी सरणी 24 sensors (temperature, pressure, O2, flow rate)
नियंत्रण प्रणाली Touchscreen HMI with remote monitoring via Ethernet
Total DC Resistance 0.000000 Ω (entire signal chain)
चुंबकीय परिरक्षण Meissner effect across all cable runs simultaneously
First-Year LN2 Included (~5,840 liters)
Annual LN2 (subsequent) ~$5,840/year (consumption varies with ambient temperature)
स्थापना 3-day on-site by certified cryo-technician
कुल सिस्टम वज़न > 1,000 kg (filled)
विद्युत आवश्यकता Dedicated 30A circuit for monitoring and reservoir heater
कमरे की आवश्यकताएँ Ventilation ≥ 10 ACH, O2 monitoring, emergency shut-off
फर्श आवश्यकता Structural assessment mandatory (>1 tonne point load)
वारंटी 5 years (cables), 3 years (reservoir and manifold), 2 years (monitoring)
पूर्ण सुपरकंडक्टिंग सिग्नल चेन। 500L LN2 रिज़र्वर। पहले वर्ष LN2 शामिल। ~5,840 लीटर/वर्ष। एक टन से अधिक।
बारीक शर्तें
- * Requires dedicated 30A electrical circuit. Room ventilation rate ≥ 10 air changes per hour mandatory. Structural engineering assessment of floor mandatory prior to installation. Local building permits may be required. First-year LN2 consumption estimate based on 22°C ambient; actual consumption varies. Subsequent years' LN2 not included. Installation date subject to cryo-technician availability. Results in non-equatorial environments may vary.